eac coc country playbooks

Summary of EAEU Technical Regulations

The Eurasian Economic Union (EAEU) and TR CU technical regulations aim to ensure product safety, quality, and consumer health protection. These regulations define mandatory standards for different product categories and clearly set out the responsibilities of manufacturers and importers.

All products must bear the EAC conformity mark. Without this marking, products cannot clear customs or be placed on the EAEU market. Full and accurate compliance with these regulations is therefore critical to maintaining uninterrupted supply chains.

Important Note

Products cannot pass customs or be sold in the EAEU market without the EAC mark.

Product Classification and Testing Requirements

The first step in obtaining EAC certification is accurate product classification. Any mistake in classification results in incorrect testing and documentation, leading to wasted time and additional costs. Products are categorized based on HS codes and matched with the applicable technical regulation.

Once classification is confirmed, the required testing scope is defined. All tests must be conducted exclusively in EAEU-accredited laboratories. Test reports form the core basis of the conformity certificate.

Product CategoryType of TestAuthorized Laboratory
Household Electrical AppliancesElectrical safety and EMC testsEAEU accredited labs
ToysToxicity and mechanical safety testsChild product designated labs
Food Contact MaterialsMigration and hygiene testsFood safety accredited labs

Tip

Correct classification at the beginning reduces testing costs and speeds up certification.

Application Documents and Timeline

The EAC conformity application requires a comprehensive documentation package. Missing or incomplete documents cause delays or rejection. Preparing these documents correctly and on time is essential.

The application follows a step-by-step timeline, starting with technical files, continuing with laboratory test reports, and finalizing with submission to the certification authority.

1. Technical File
Manufacturer

Product passport, user manual, risk analysis.

2. Test Reports
Accredited Laboratory

Results according to mandatory regulations.

3. Certificate Application
Certification Authority

Application form, payment proof, authorization documents.

Step 1
Document Preparation

Manufacturer prepares the required technical documentation.

Step 2
Laboratory Testing

Product is tested in EAEU-accredited laboratories.

Step 3
Submission and Evaluation

Certification body reviews documents and issues certificate.

Warning

Incomplete documentation may extend the process by 4–6 weeks.

Approved Laboratory Selection

All tests for EAC certification must be performed only in laboratories accredited by the EAEU. Reports from non-accredited labs are rejected. Laboratory choice is a strategic step that impacts both cost and timing.

Selection should consider product category, accreditation scope, capacity, and reporting language. Correct selection accelerates the process, while mistakes lead to retesting and extra expenses.

Warning: Only test reports from EAEU-accredited labs are valid.
Accreditation Check

Verify that the lab is listed in the official EAEU register.

Time and Capacity

Laboratory workload directly affects project duration.

Reporting Language

All reports must be issued in Russian.

Tip

Choose labs that can cover multiple product categories to save both time and costs.

Labeling and Language Requirements

Products certified with an EAC mark must comply with labeling and language requirements before being placed on the EAEU market. Labels must include technical and commercial information. Incorrect or incomplete labeling may cause customs delays or even product recalls.

Russian is mandatory on all labels. Manufacturer name, importer details, country of origin, EAC mark, and basic usage instructions must be included. Label clarity, accuracy, and durability are key during inspections.

Critical Requirement

Products without manufacturer/importer details and the EAC mark on labels cannot pass customs or be sold.

Information FieldDetailsRequirement
Manufacturer DetailsName, address, contact infoRussian and Latin alphabet
Importer DetailsLocal representative name and addressRussian mandatory
EAC MarkOn product or packagingMandatory
User InstructionsAssembly and usage guidelinesRussian mandatory
"Language and labeling are not just legal requirements, but the foundation of consumer trust."

Common Customs Issues

Even with EAC or COC certificates, companies may encounter obstacles during customs clearance. Most problems arise from documentation errors, misclassification, or labeling deficiencies. Anticipating these risks helps prevent delays and extra costs.

Small errors in product classification can subject goods to entirely different regulations. Inconsistencies in shipping documents and invoices are another frequent cause of detention.

Incorrect HS Code

Wrong categorization results in unnecessary testing and certification requirements.

Incomplete or Wrong Labeling

Lack of Russian translation or missing EAC mark leads to rejection.

Shipping Document Inconsistencies

Differences between invoice, packing list, and certificates delay clearance.

Unaccepted Lab Reports

Reports from non-accredited labs are considered invalid.

Attention: Documentation and classification errors may cause goods to be held at customs for 2–3 months.

Cost and Duration Estimates

The costs and timelines for obtaining EAC and COC certificates vary depending on product category, testing scope, and certificate type. Total expenses usually include laboratory fees, application charges, and consultancy services. Duration is heavily influenced by laboratory capacity and documentation completeness.

On average, certification can take between 2 and 12 weeks. Costs may range from a few thousand to tens of thousands of USD depending on product complexity and regulation requirements.

Certificate TypeAverage CostAverage Duration
EAC Declaration of Conformity3,000 – 5,000 USD2 – 4 weeks
EAC Certificate of Conformity7,000 – 12,000 USD4 – 8 weeks
COC Certificate5,000 – 10,000 USD3 – 6 weeks

Tip

Submitting complete documents and applying during low-demand periods at labs can significantly shorten the certification process.

Renewal and Scope Extension

EAC and COC certificates are valid for limited durations, typically ranging from 1 to 5 years. When validity ends, renewal is required. Renewal is usually faster than the initial process since previous documentation and test results can be referenced.

Scope extension allows additional products to be included in an existing certificate. In this case, only the new products require testing, and the certificate is reissued. This approach is cost-effective for companies expanding within the same product category.

Certificate Renewal

Renewal should be requested before expiration to ensure uninterrupted validity.

Scope Extension

Adding new products under the same certificate reduces costs and time.

Info: During scope extension, existing products do not require retesting—only the added items are tested.

Supplier/Importer Roles and Responsibilities

In the EAC & COC certification process, the roles of manufacturer, supplier, and importer are clearly defined. The manufacturer provides the technical file and product safety documents, while the importer ensures compliance with local regulations and acts as the official applicant when required.

For manufacturers outside the EAEU, the importer typically assumes the role of applicant and becomes legally responsible. This makes collaboration between suppliers and importers a strategic necessity.

PartyResponsibilityDescription
ManufacturerPrepare Technical FileProduct passport, manuals, safety test results.
SupplierProvide Product and DocumentsEnsure completeness and timely delivery of required papers.
ImporterOfficial Application & Local ComplianceActs as applicant and assumes full legal responsibility within the EAEU.

Note

Since the importer appears as the official applicant, they carry all legal obligations tied to the certificate.

Case Studies

Practical experiences from various industries highlight the importance of correct compliance with EAC and COC regulations. These case studies help companies identify common mistakes and adopt best practices.

Below are real-world examples showing challenges and lessons learned:

An electronics manufacturer faced a two-month customs delay due to using an incorrect HS code. After reclassification, clearance was achieved in just three weeks.
AE
EuroElectro

Manufacturer

A toy importer had its products withdrawn from the market for failing to provide Russian-language user instructions. In the next shipment, compliance was ensured and clearance was smooth.
TI
Toy Import Ltd.

Importer

A supplier of food-contact materials applied for scope extension. Thanks to fast testing of new items, the company secured a single certificate valid for 5 years.
FP
FoodPack Global

Supplier

Lessons Learned

The most frequent errors are misclassification, incomplete labeling, and missing documents. Addressing these early prevents delays and reduces long-term costs.


Please Wait